Monday, 30 November 2009

DO SOME BLOODY WORK...

As I'm not at work during the week this week I need to catch up on as much as possible, and as I'm supposed to be documenting all that on here I though I'd put a list on here. That way, when I haven't complete it you can all give me grief!

First up is the group project:

We're aiming to have all the set stuff done for Thursday so we can use Friday to do some line tests. My jobs are to do the set for the flashback in the Granny's house, which I've done, the piles of rubbish for building up the outside sets, which I want to try get done tomorrow, to design a 2D pensioner for the background characters and a few props for the granny to kick about, which i'll hopefully get done tomorrow too, but failing that Wednesday. Tonight I've been typing up out plan of action time table thing so we know what we're aiming to do as a group over the next few weeks. I also need to finish the script now that I've had some input from the guys, and it needs a little rejigging just so the ending flows a little better.

Next to do is my live brief:

I had to do a small presentation today so that my lecturer Dave knows where I'm at with everything. I had hoped to start making the maquettes this week and start making the clay models ready to cast the moulds, but it seems I need to work on the story. Dave suggests I do more stuff that can only be achieved as easily using animation, I guess, if this was for a client, as a way of justifying doing it in animation rather than live action which would be less time consuming. So I need to add a lot more to it. I did want to add more to it anyway but I was worried it might be too much, so Dave suggesting I should means I can just go for it. It's a good thing but it does mean it'll slow me down a little reworking it and redoing story boards. I also wanted to get more of my character designs down this week, so maybe I'll do all that on Thursday if I manage to get all the group stuff done according to plan.

SOOOOO...

Tuesday:       Outdoors Sets for Group project
                       Editing Script
                       Props - rubbish and granny's trolley
                       2D Pensioner
                 
Wednesday: Completing any work from Tuesday 
                       Make a start on the next tasks if possible...

Thursday:     Rework story for live brief
                       Rework story boards, draw up plan of layout.
                       Character Designs finalized 

Friday:          Line test in group
                       Wire armatures for maquettes.

Well, I'm not so sure how well all that will go but here's hoping! Will try and post stuff as I do it so I can see what I have actually managed to get done.

1 comment: